
See what's inside
Rates & Job Costing
Multi-Work-Center Rate & Utilization Model
Scale a single work center's rate build-up to a full multi-center model: enter each work center's machine cost, labor headcount and capacity, distribute your overhead pools across them, and apply per-center utilization to see the labor-burden rate, the overhead-and-machine rate and the fully burdened rate per center. A Dashboard shows the blended rate across the whole shop, Rate Comparison ranks every center against it, and Utilization Sensitivity re-computes each center's rate at utilization levels you choose. Built for 20-50 person shops the single-rate calculator can't express. Every rate is built up from your own overhead, wages and utilization; the workbook ships with no assumed shop rate, no industry burden benchmark and no default utilization figure. Those numbers are yours to enter.
- Format
- ZIP
- Size
- 89 KB
- Version
- 1.0.0 · October 2026
- Delivery
- Instant download · Secure checkout
$99
Instant digital download · all sales final. Refund policy
What’s included
- Per-work-center burden and machine-rate build-up from the shop's own overhead and wages
- Utilization inputs per center that adjust effective hourly rates
- Machine-rate vs labor-rate split per work center
- Blended-rate Dashboard and a Rate Comparison ranking every center against it
- Utilization Sensitivity: each center's rate at up to five utilization levels you choose
- Editable overhead-allocation and utilization settings
Outgrowing spreadsheets?
WorkTickets SaaS adds live WIP tracking and one-tap kiosk clock-in on top of this template.
Join the WorkTickets waitlist